Opens in a new tab

CE Certification for Packaging Machinery: Complete Guide

Buyer Guides

Introduction

CE marking is mandatory for packaging machinery sold in the European Economic Area (EEA). For buyers, understanding CE certification helps you evaluate suppliers and ensures your equipment meets safety and health requirements.

In this guide, we explain CE certification requirements for packaging machinery, what it means for buyers, and how to verify that equipment you purchase is truly CE compliant.

Key Takeaway: CE marking isn’t just a logo—it’s a formal declaration that machinery meets EU safety, health, and environmental requirements. Understanding it protects your investment and ensures workplace safety.

What is CE Marking?

Purpose of CE Marking

CE marking indicates that machinery:
– Has been assessed before being placed on the market
– Meets EU Essential Health and Safety Requirements (EHSRs)
– Has been subject to the applicable conformity assessment procedure
– Is safe for users and the environment

Legal Framework:

Regulation Scope Date
Machinery Directive 2006/42/EC Machinery and safety components 2009 – 2027
Regulation (EU) 2023/1230 New Machinery Regulation 2027 onwards

What CE Marking Does NOT Mean

Common Misconceptions:
– ❌ CE doesn’t certify quality
– ❌ CE doesn’t certify performance
– ❌ CE doesn’t mean “Made in Europe”
– ❌ CE doesn’t guarantee fitness for purpose
– ❌ CE isn’t a certification from a testing organization

Essential Requirements for Packaging Machinery

Machinery Directive Annex I

Key Sections:

Section Requirements Application
1.1 General principles Risk assessment
1.2 Control systems Safety circuits
1.3 Protection against mechanical hazards Moving parts, pinch points
1.4 Required characteristics of guards Fixed guards, interlocked guards
1.5 Other hazards Electrical, noise, ergonomics
1.6 Maintenance Safe access, maintenance points
1.7 Information for users Marking, instructions

Specific Hazards for Packaging Machinery

Mechanical Hazards:

Hazard Protection Required
Pinch points Guards, sensors, safe distances
Rotating parts Enclosure, guards
Sharp edges Rounded edges, covers
Ejected parts Fragment guards
Falling objects Canopy, guarding

Electrical Hazards:
– Grounding
– Insulation
– Overcurrent protection
– Emergency stop circuits

Noise Hazards:
– Noise assessment required
– Hearing protection made available above 80 dB(A) and mandatory above 85 dB(A)
– Noise reduction measures

Ergonomic Hazards:
– Control layout
– Display visibility
– Reach distances
– Manual handling

What Does the CE Certification Process Involve?

For Manufacturers

Step 1: Determine Applicable Requirements
– Identify relevant EU directives
– Assess essential requirements
– Determine need for Notified Body involvement

Step 2: Risk Assessment
– Identify hazards
– Assess risks
– Determine risk reduction measures
– Document in technical file

Step 3: Design and Manufacturing
– Implement safety measures
– Apply harmonized standards
– Document design

Step 4: Conformity Assessment
– Internal factory checks
– Or Notified Body assessment
– Technical file compilation

Step 5: Declaration and Marking
– Draft EU Declaration of Conformity
– Affix CE marking
– Prepare user instructions

Documentation Requirements

Technical File Contents:

Document Description
General description Product overview
Design drawings Assembly, sub-assemblies, circuits
Descriptions and explanations Understanding of drawings
List of standards Harmonized standards applied
Risk assessment Identified hazards, risk reduction
Test reports Verification of safety
Manuals Installation, operation, maintenance
Declaration EU Declaration of Conformity

Retention Period: 10 years after last machine placed on market

Harmonized Standards for Packaging Machinery

Key Standards for Packaging Machinery

EN ISO 12100:2010
– Safety of machinery – General principles
– Risk assessment and risk reduction
– Fundamental principles

EN 415 Series (Packaging Machinery):

Standard Scope
EN 415-1 Safety of packaging machines – Terminology and classification (general requirements are in EN 415-10)
EN 415-2 Safety of packaging machines – Pre-formed rigid container packaging machines
EN 415-3 Safety of packaging machines – Form, fill and seal machines
EN 415-5 Safety of packaging machines – Wrapping machines
EN 415-6 Safety of packaging machines – Pallet wrapping machines

Electrical Standards:
– EN 60204-1: Safety of machinery – Electrical equipment
– EN ISO 13849-1: Safety-related parts of control systems

Safety-Related Control Systems

Performance Level Requirements

EN ISO 13849-1 defines safety performance:

Performance Level Target Fault Tolerance Application
PLr a None Low risk
PLr b Low Low risk
PLr c Low Moderate risk
PLr d Medium High risk
PLr e High Very high risk

Packaging Machinery Examples:

Function Required PL Example
Emergency stop PLd or PLe E-stop button
Guard interlock PLd Safety door switch
Pressure relief PLd Hydraulic safety
Light curtain PLd Area protection

Safety Components

Notified Body involvement is required only for machinery or safety components listed in Annex IV of the Machinery Directive where harmonized standards are not fully applied. Ordinary packaging machinery — flow wrappers included — normally follows the internal-check route with a manufacturer’s self-declaration; whether a safety component needs a Notified Body follows its own conformity route, not a blanket category rule.

Note: the Machinery Directive 2006/42/EC applies until 19 January 2027; Regulation (EU) 2023/1230 applies from 20 January 2027.

The EU Declaration of Conformity

Required Elements

EU Declaration of Conformity must include:

  1. Manufacturer name and address
  2. Authorized representative (if applicable)
  3. Product identification (type, model, serial number)
  4. Statement of conformity
  5. Directives and standards applied
  6. Notified Body details (if applicable)
  7. Place and date of issue
  8. Signatory information

Example Statement:

“We hereby declare that the machinery described below conforms to all the relevant provisions of Directive 2006/42/EC .”

Buyer Verification: What to Request and Check

What to Request from Suppliers

Documentation Checklist:

Document Purpose Must Have
EU Declaration of Conformity Legal declaration ✅ Yes
CE marking Visual confirmation ✅ Yes
Technical file Evidence of compliance ⚠️ Available on request
Test reports Verification ⚠️ Available on request
Harmonized standards list Standards applied ✅ Yes
Operating instructions User information ✅ Yes

Red Flags

Warning Signs of Non-Compliance:

  1. Documentation Issues
    • No EU Declaration of Conformity
    • Declaration missing required elements
    • Self-declared CE for machinery requiring Notified Body
    • No harmonized standards listed
  2. Technical Issues
    • No risk assessment documentation
    • Missing safety circuit documentation
    • Emergency stops missing or inadequate
    • Guards without proper safety switches
  3. Certification Issues
    • CE marking looks unofficial
    • Certificate from unknown Notified Body
    • Certificate doesn’t match the machine
    • Certificate is expired

Verification Steps

Step 1: Request Documentation
– EU Declaration of Conformity
– List of harmonized standards applied
– Electrical schematics (safety circuits)
– Operating instructions

Step 2: Verify Certificate
– Check Notified Body number
– Verify with Notified Body database
– Confirm certificate scope matches product

Step 3: Physical Inspection
– Verify CE marking present and correct
– Check safety devices installed
– Verify emergency stops functional
– Check documentation matches machine

CE Marking Requirements: Placement and Dimensions

Where to Affix CE Marking

Rules:
1. CE marking must be visible, legible, and indelible
2. Must be affixed before machine placed on market
3. Must be near other manufacturer markings
4. No additional marking that misleads third parties

Correct Placement:

[Manufacturer Name]
[Model Number]
[Serial Number]
CE
[Year of manufacture]

Dimensions

Dimension Minimum Size
Height (H) 5mm minimum
Proportions Must be maintained

What You Need to Know Before Importing CE Marked Machinery

Responsibilities of Importers

Importers must:
– Ensure machinery has CE marking
– Verify documentation provided
– Ensure instructions in local language
– Provide contact information in EU
– Cooperate with market surveillance

Documentation to Retain

Keep on file:
– EU Declaration of Conformity
– Technical file (or access to it)
– Correspondence with manufacturer
– Evidence of verification activities

Path Pack CE Documentation

Our Approach

As a responsible manufacturer, Path Pack provides:

Complete CE Documentation:
– EU Declaration of Conformity
– Risk assessment report
– List of harmonized standards applied
– Test reports for safety functions
– Electrical schematics (EN standard)
– Operating and maintenance instructions

Safety Features:
– Category 3 safety circuits for emergency stops
– PLd safety level for guard interlocks
– Siemens safety PLC option
– Full guarding package

Verification:
– CE marking on machine
– Technical file available
– Test reports provided
– Declaration valid and current

Documentation Package

Included with Every Machine:

Document Format
EU Declaration of Conformity Original + copy
Operating instructions English (other languages available)
Maintenance manual English
Electrical drawings IEC standard, PDF + CAD
Spare parts list PDF
Risk assessment PDF
Test reports PDF

Conclusion

CE certification is a structured process that ensures machinery meets EU safety requirements. For buyers, understanding CE marking helps you evaluate suppliers and ensures the equipment you purchase is safe and legally compliant.

Key Takeaways:
1. CE marking is mandatory for machinery in the EEA
2. CE requires complete documentation
3. Safety circuits must meet specific performance levels
4. Verify CE compliance before purchasing
5. Retain documentation for your records

Questions about CE certification?

Our team is experienced in CE compliance and can provide:
– Complete CE documentation package
– Technical file for validation
– Risk assessment documentation
– Ongoing compliance support

  • 📞 Contact us for CE compliance information
  • 📧 Email our technical team
  • 🔍 Request sample documentation

About Path Pack

Path Pack provides CE certified packaging machinery with complete documentation packages. Our machines meet all EU Essential Health and Safety Requirements and are legally compliant for the European market.

For industry-specific regulations, see our pharmaceutical packaging regulations guide.

When sourcing machines from China, also read our guide on evaluating Chinese packaging machine suppliers.

Why customers trust our CE certification:
– ✅ Complete EU Declaration of Conformity
– ✅ Full technical file documentation
– ✅ Risk assessment included
– ✅ Harmonized standards applied
– ✅ Notified Body assessment (where required)
– ✅ Test reports for safety functions

Share this

Related Post

Have a Packaging Problem Worth Solving?

×

if you have any question about packaging machine, Do not hesitate to contact us 24/7.

Your email will be send to our CEO’s inbox and Sales Team directly.

We will reply within One Working Day.

1